English   |   Indonesia   |   Mandarin
geo-capa-large

Barge Loading Facility

After the crushing process, the coal goes to the port stockpile from where it is transported by wheel loaders to an overhead belt conveyor and loaded onto the barges. Our existing barge loading facility at Samarinda has a loading capacity of 1,000 tonnes per hour. We will build more barge loading facilities at new mining sites, including the BEK mine.